Replacement of the fire safety systems at Bercy (Colbert, Vauban complex including conference centre, parking, Necker complex including crèche and CEDEF, Sully and Turgot buildings)

DEVELOPMENT OF A SAFETY COMMAND POST COVERING 100M2-GENERAL CONTRACTING

Project details:

  • False ceilings / false floors
  • Painting
  • Lighting
  • furniture

FIRE SAFETY SYSTEMS

Project details:

  • Replacement of fire detection systems (removal of 4135 existing fire detectors,
  • Installation of approximately 4600 new detectors and 500 new manual triggers
  • Replacement of control units (approx. 4500 DAS / DCT)
  • Replacement of UGCIS and non-compliant electromagnetic locking devices,
  • Installation of light diffusers in common areas and replacement of existing sound diffusers (approximately 2000 ),
  • Installation of relay boxes for smoke extraction ventilators,
  • Improvement of the system of closing of the smoke extraction vents,
  • Replacement of control panels for gas fire extinguishing systems
  • Implementation of a Exploitation Assistance Unit,
  • Renovation of the PCI Vauban,
  • Creation of Fireproof Technical Volumes and Pathways,
  • Removal of the existing intercom system and any existing unused equipment.