Technical renovation of the former Forum des Halles

HVAC – PLUMBING

Project details:

  • Replacement of spraying system with a Change Over solution (12 cycle process)
  • Climatic treatment of malls by fan coil units with 2 tubes and 2 wires
  • Creation of the chilled water network

SMOKE EXTRACTION

Project details:

  • Renovation of the 4 smoke extraction plants
  • Refurbishment / renovation of existing smoke extraction systems for 12V / h compliance (IT246)
  • Replacement of all existing fire dampers (250)
  • Addition of new smoke extraction systems
  • Adaptation of flows according to new safety zoning

HIGH VOLTAGE ELECTRICITY

Project details:

  • Renovation of the electrical installations in common areas (ambient lighting, safety lighting, electrical distribution of shops by removing canalis, etc.)
  • Rehabilitation of power supplies in smoke extraction plants.
  • Renovation of the divisional boards for each compartment

FIRE SAFETY SYSTEMS

Scope of work:

  • Implementation of a unique fire safety system throughout the facility: 2500 detectors with single-sheet detection, 900 DAS,
  • Decentralized architecture in Fireproof technical volumes (2H)
  • Implementation of an operations support unit
  • Dialogue between old and new fire safety system involving the implementation of a communication gateway validated by site notice